RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2414027080 - Archived data from Tue, 11. August 2020 17:22:54 CEST


This is all the information about APD 2414027080. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2414027080
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2414027080/2406026337
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.3 V
Dark current: 7.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 19
Position in Box: 49
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.4128457 V     T = -25 °C: 345.7676715 V
Voltage for Gain 150: T = +20 °C: 389.1886316 V     T = -25 °C: 353.1171547 V
Voltage for Gain 200: T = +20 °C: 393.5191348 V     T = -25 °C: 357.2267433 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.727311594 V-1     T = -25 °C: 4.895268729 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.284184528 V-1     T = -25 °C: 9.888546698 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.20545703 V-1     T = -25 °C: 15.40903401 V-1
Break-through voltage: T = +20 °C: 408.5417484 V     T = -25 °C: 371.896514 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:17 CET jreher Updated box and position via API.
03. Feb 2021 18:16:27 CET jreher Updated box and position via API.
11. Aug 2020 17:22:54 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:45:25 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:22 CET jreher Updated box and position via API.
27. Nov 2019 19:32:50 CET jreher Updated APD location via API.
25. Nov 2019 17:12:25 CET jreher Updated box and position via API.
04. Jul 2019 11:08:49 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:52 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:47 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:00 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:44 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.