RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2414027077 - Archived data from Mon, 17. August 2020 15:53:06 CEST


This is all the information about APD 2414027077. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2414027077
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.4 V
Dark current: 8.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 19
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.2744743 V     T = -25 °C: 347.5880858 V
Voltage for Gain 150: T = +20 °C: 391.0827146 V     T = -25 °C: 354.9937736 V
Voltage for Gain 200: T = +20 °C: 395.4125124 V     T = -25 °C: 359.1356947 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.436328143 V-1     T = -25 °C: 4.934081027 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.418182653 V-1     T = -25 °C: 9.007354456 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.48744081 V-1     T = -25 °C: 15.58835188 V-1
Break-through voltage: T = +20 °C: 410.1477931 V     T = -25 °C: 373.7435949 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:17 CET jreher Updated box and position via API.
03. Feb 2021 18:16:27 CET jreher Updated box and position via API.
07. Oct 2020 12:16:10 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:06 CEST jreher Updated box and position via API.
11. Aug 2020 17:22:54 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:50 CET jreher Updated APD location via API.
25. Nov 2019 17:12:25 CET jreher Updated box and position via API.
04. Jul 2019 11:08:49 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:52 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:47 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:00 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:43 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.