RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2414027070 - Archived data from Wed, 03. February 2021 18:16:26 CET


This is all the information about APD 2414027070. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2414027070
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.6 V
Dark current: 6.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 19
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.6227141 V     T = -25 °C: 344.0859623 V
Voltage for Gain 150: T = +20 °C: 387.4648443 V     T = -25 °C: 351.4807351 V
Voltage for Gain 200: T = +20 °C: 391.8621031 V     T = -25 °C: 355.6377908 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.641055908 V-1     T = -25 °C: 4.766511076 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.976958405 V-1     T = -25 °C: 9.500904201 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.38503359 V-1     T = -25 °C: 14.78301617 V-1
Break-through voltage: T = +20 °C: 407.7715452 V     T = -25 °C: 371.0621566 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:16 CET jreher Updated box and position via API.
03. Feb 2021 18:16:26 CET jreher Updated box and position via API.
11. Aug 2020 17:22:53 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:49 CET jreher Updated APD location via API.
25. Nov 2019 17:12:24 CET jreher Updated box and position via API.
04. Jul 2019 11:08:48 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:51 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:46 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:59 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 12:48:10 CET markus.moritz
03. Jan 2019 00:11:43 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.