RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2414027063 - Archived data from Tue, 11. August 2020 17:22:52 CEST


This is all the information about APD 2414027063. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2414027063
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2414027063/0823009018
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C04
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 19
Position in Box: 33
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.0688136 V     T = -25 °C: 346.6078895 V
Voltage for Gain 150: T = +20 °C: 389.9114323 V     T = -25 °C: 354.1241132 V
Voltage for Gain 200: T = +20 °C: 394.3154698 V     T = -25 °C: 358.2944417 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.889011146 V-1     T = -25 °C: 4.896574127 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.735749732 V-1     T = -25 °C: 9.826307891 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.55249567 V-1     T = -25 °C: 14.63889176 V-1
Break-through voltage: T = +20 °C: 409.3277472 V     T = -25 °C: 373.156246 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:15 CET jreher Updated box and position via API.
03. Feb 2021 18:16:25 CET jreher Updated box and position via API.
11. Aug 2020 17:22:52 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:07:03 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:47 CET jreher Updated box and position via API.
27. Nov 2019 19:32:48 CET jreher Updated APD location via API.
25. Nov 2019 17:12:23 CET jreher Updated box and position via API.
04. Jul 2019 11:08:48 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:50 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:45 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:45 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 12:56:50 CET markus.moritz
03. Jan 2019 00:11:43 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:47 CET Tobias Imported from Hamamatsu datasheet.