RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2414027062 - Archived data from Tue, 11. August 2020 17:22:51 CEST


This is all the information about APD 2414027062. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2414027062
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E05
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.7 V
Dark current: 13.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 19
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7660743 V     T = -25 °C: 345.3592036 V
Voltage for Gain 150: T = +20 °C: 388.6075384 V     T = -25 °C: 352.6849803 V
Voltage for Gain 200: T = +20 °C: 392.9975714 V     T = -25 °C: 356.8457027 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.838441198 V-1     T = -25 °C: 4.498781086 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.705992242 V-1     T = -25 °C: 9.604654593 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.58665205 V-1     T = -25 °C: 15.03397564 V-1
Break-through voltage: T = +20 °C: 408.7094162 V     T = -25 °C: 372.1763987 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:22:26 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:27:20 CET jreher Updated box and position via API.
05. Feb 2021 10:50:15 CET jreher Updated box and position via API.
03. Feb 2021 18:16:25 CET jreher Updated box and position via API.
11. Aug 2020 17:22:51 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:48 CET jreher Updated APD location via API.
25. Nov 2019 17:12:23 CET jreher Updated box and position via API.
04. Jul 2019 11:08:48 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:50 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:45 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:45 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 12:57:52 CET markus.moritz
03. Jan 2019 00:11:43 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:47 CET Tobias Imported from Hamamatsu datasheet.