RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2414027056 - Archived data from Tue, 11. August 2020 17:22:50 CEST


This is all the information about APD 2414027056. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2414027056
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.8 V
Dark current: 5.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 19
Position in Box: 26
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.4743928 V     T = -25 °C: 349.53358 V
Voltage for Gain 150: T = +20 °C: 393.327788 V     T = -25 °C: 356.9995445 V
Voltage for Gain 200: T = +20 °C: 397.6427221 V     T = -25 °C: 361.1509532 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.385122272 V-1     T = -25 °C: 4.855011285 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.26702075 V-1     T = -25 °C: 8.940466632 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.6808075 V-1     T = -25 °C: 14.46901932 V-1
Break-through voltage: T = +20 °C: 412.6371916 V     T = -25 °C: 376.1646859 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:34:21 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:23 CEST jreher Updated box and position via API.
05. Feb 2021 10:50:14 CET jreher Updated box and position via API.
03. Feb 2021 18:16:24 CET jreher Updated box and position via API.
11. Aug 2020 17:22:50 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:48 CET jreher Updated APD location via API.
25. Nov 2019 17:12:23 CET jreher Updated box and position via API.
04. Jul 2019 11:08:47 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:50 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:45 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:44 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 13:56:16 CET markus.moritz
03. Jan 2019 00:11:43 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:47 CET Tobias Imported from Hamamatsu datasheet.