RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2414027039 - Archived data from Wed, 03. February 2021 18:16:23 CET


This is all the information about APD 2414027039. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2414027039
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.7 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 19
Position in Box: 10
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.7246414 V     T = -25 °C: 353.4430835 V
Voltage for Gain 150: T = +20 °C: 397.5152907 V     T = -25 °C: 360.9476477 V
Voltage for Gain 200: T = +20 °C: 401.8432676 V     T = -25 °C: 365.1537624 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.67196053 V-1     T = -25 °C: 4.53288671 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.085060768 V-1     T = -25 °C: 9.246629318 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.18964178 V-1     T = -25 °C: 14.71237066 V-1
Break-through voltage: T = +20 °C: 416.0248754 V     T = -25 °C: 379.8159697 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:13 CET jreher Updated box and position via API.
03. Feb 2021 18:16:23 CET jreher Updated box and position via API.
11. Aug 2020 17:22:47 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:47 CET jreher Updated APD location via API.
25. Nov 2019 17:12:22 CET jreher Updated box and position via API.
04. Jul 2019 11:08:46 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:49 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:44 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:43 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 14:11:29 CET markus.moritz
03. Jan 2019 00:11:42 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:47 CET Tobias Imported from Hamamatsu datasheet.