RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2413026995 - Archived data from Mon, 26. April 2021 15:21:42 CEST


This is all the information about APD 2413026995. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2413026995
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F14
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 387.5 V
Dark current: 10.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 18
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.687961 V     T = -25 °C: 351.6025621 V
Voltage for Gain 150: T = +20 °C: 395.5202309 V     T = -25 °C: 359.128825 V
Voltage for Gain 200: T = +20 °C: 399.8731641 V     T = -25 °C: 363.347671 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.584797983 V-1     T = -25 °C: 4.841389732 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.906749993 V-1     T = -25 °C: 9.581057233 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.2177652 V-1     T = -25 °C: 14.77960374 V-1
Break-through voltage: T = +20 °C: 415.2661911 V     T = -25 °C: 378.8526241 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:41:44 CET oafedulidis Assigned to capsule by script
27. Aug 2021 10:31:13 CEST oafedulidis Updated box and position via API.
26. Apr 2021 15:21:42 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:50:07 CET jreher Updated box and position via API.
03. Feb 2021 18:16:16 CET jreher Updated box and position via API.
11. Aug 2020 17:22:41 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:37 CET jreher Updated APD location via API.
25. Nov 2019 17:12:19 CET jreher Updated box and position via API.
04. Jul 2019 11:08:39 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:46 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:41 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:33 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 11:57:00 CET markus.moritz
03. Jan 2019 00:11:41 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:47 CET Tobias Imported from Hamamatsu datasheet.