RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2413026989 - Archived data from Tue, 06. October 2020 16:53:09 CEST


This is all the information about APD 2413026989. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2413026989
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 384.1 V
Dark current: 6.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 18
Position in Box: 23
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.8666082 V     T = -25 °C: 348.4749962 V
Voltage for Gain 150: T = +20 °C: 391.7154773 V     T = -25 °C: 355.9802611 V
Voltage for Gain 200: T = +20 °C: 396.0926004 V     T = -25 °C: 360.1229737 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.359828007 V-1     T = -25 °C: 4.971321495 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.282101772 V-1     T = -25 °C: 9.673882302 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.26708921 V-1     T = -25 °C: 15.36432378 V-1
Break-through voltage: T = +20 °C: 408.989161 V     T = -25 °C: 374.6988497 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:06 CET jreher Updated box and position via API.
03. Feb 2021 18:16:16 CET jreher Updated box and position via API.
08. Dec 2020 17:17:56 CET jreher Assigned to capsule by script
06. Oct 2020 16:53:09 CEST jreher Updated box and position via API.
11. Aug 2020 17:22:40 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:37 CET jreher Updated APD location via API.
25. Nov 2019 17:12:18 CET jreher Updated box and position via API.
04. Jul 2019 11:08:39 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:45 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:40 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:25 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 11:54:05 CET markus.moritz
03. Jan 2019 00:11:41 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:46 CET Tobias Imported from Hamamatsu datasheet.