RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2413026980 - Archived data from Fri, 05. February 2021 10:50:05 CET


This is all the information about APD 2413026980. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2413026980
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.3 V
Dark current: 9.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 18
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.4670991 V     T = -25 °C: 346.8233794 V
Voltage for Gain 150: T = +20 °C: 390.3751628 V     T = -25 °C: 354.2205791 V
Voltage for Gain 200: T = +20 °C: 394.7069826 V     T = -25 °C: 358.4274288 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.491722691 V-1     T = -25 °C: 4.875526174 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.838089227 V-1     T = -25 °C: 9.108262092 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.00824292 V-1     T = -25 °C: 15.54709324 V-1
Break-through voltage: T = +20 °C: 409.927822 V     T = -25 °C: 373.577009 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:21:41 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:50:05 CET jreher Updated box and position via API.
03. Feb 2021 18:16:15 CET jreher Updated box and position via API.
11. Aug 2020 17:22:38 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:36 CET jreher Updated APD location via API.
25. Nov 2019 17:12:17 CET jreher Updated box and position via API.
04. Jul 2019 11:08:38 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:44 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:25 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:05:56 CET markus.moritz
03. Jan 2019 00:11:41 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:46 CET Tobias Imported from Hamamatsu datasheet.