RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2413026979 - Archived data from Wed, 03. February 2021 18:16:15 CET


This is all the information about APD 2413026979. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2413026979
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B13
Break-through voltage: 422 V
Voltage for Gain 100 (T=+25°C): 393.5 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 18
Position in Box: 6
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 394.2066364 V     T = -25 °C: 357.6807451 V
Voltage for Gain 150: T = +20 °C: 402.0805856 V     T = -25 °C: 365.3603627 V
Voltage for Gain 200: T = +20 °C: 406.4157067 V     T = -25 °C: 369.6394426 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.410935 V-1     T = -25 °C: 4.667122757 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.297459434 V-1     T = -25 °C: 8.695130361 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.29508161 V-1     T = -25 °C: 15.2897086 V-1
Break-through voltage: T = +20 °C: 421.0578781 V     T = -25 °C: 384.717585 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:21:41 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:50:05 CET jreher Updated box and position via API.
03. Feb 2021 18:16:15 CET jreher Updated box and position via API.
11. Aug 2020 17:22:38 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:36 CET jreher Updated APD location via API.
25. Nov 2019 17:12:17 CET jreher Updated box and position via API.
04. Jul 2019 11:08:38 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:44 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:25 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:09:10 CET markus.moritz
03. Jan 2019 00:11:40 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:46 CET Tobias Imported from Hamamatsu datasheet.