RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2413026976 - Archived data from Tue, 11. August 2020 17:22:37 CEST


This is all the information about APD 2413026976. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2413026976
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2608029779/2413026976
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.1 V
Dark current: 8.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 18
Position in Box: 11
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.0983661 V     T = -25 °C: 345.7133003 V
Voltage for Gain 150: T = +20 °C: 388.9038294 V     T = -25 °C: 353.0796635 V
Voltage for Gain 200: T = +20 °C: 393.2587925 V     T = -25 °C: 357.2110902 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.587493212 V-1     T = -25 °C: 5.001514321 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.440521403 V-1     T = -25 °C: 9.036189662 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 16.00392901 V-1     T = -25 °C: 14.95828554 V-1
Break-through voltage: T = +20 °C: 407.9447451 V     T = -25 °C: 371.8671992 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:05 CET jreher Updated box and position via API.
03. Feb 2021 18:16:14 CET jreher Updated box and position via API.
11. Aug 2020 17:22:37 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:46:08 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:53 CET jreher Updated box and position via API.
27. Nov 2019 19:32:36 CET jreher Updated APD location via API.
25. Nov 2019 17:12:17 CET jreher Updated box and position via API.
04. Jul 2019 11:08:38 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:44 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:24 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 11:58:28 CET markus.moritz
03. Jan 2019 00:11:40 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:46 CET Tobias Imported from Hamamatsu datasheet.