RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2413026971 - Archived data from Tue, 11. August 2020 17:22:36 CEST


This is all the information about APD 2413026971. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2413026971
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2413026971/1415016210
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 384.8 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 18
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.0039411 V     T = -25 °C: 349.232987 V
Voltage for Gain 150: T = +20 °C: 392.9269447 V     T = -25 °C: 356.716039 V
Voltage for Gain 200: T = +20 °C: 397.3358511 V     T = -25 °C: 360.9099961 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.503833279 V-1     T = -25 °C: 4.769204607 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.727578981 V-1     T = -25 °C: 9.250700892 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.65530616 V-1     T = -25 °C: 14.86345501 V-1
Break-through voltage: T = +20 °C: 413.1529658 V     T = -25 °C: 376.4822902 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:04 CET jreher Updated box and position via API.
03. Feb 2021 18:16:14 CET jreher Updated box and position via API.
11. Aug 2020 17:22:36 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:49:39 CEST jreher Assigned to capsule by script
13. Feb 2020 15:11:37 CET jreher Updated box and position via API.
27. Nov 2019 19:32:36 CET jreher Updated APD location via API.
25. Nov 2019 17:12:17 CET jreher Updated box and position via API.
04. Jul 2019 11:08:37 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:44 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:24 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 11:55:06 CET markus.moritz
03. Jan 2019 00:11:40 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:46 CET Tobias Imported from Hamamatsu datasheet.