RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2413026969 - Archived data from Tue, 11. August 2020 17:22:36 CEST


This is all the information about APD 2413026969. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2413026969
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E14
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.5 V
Dark current: 9.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 18
Position in Box: 5
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.9594083 V     T = -25 °C: 351.8120589 V
Voltage for Gain 150: T = +20 °C: 395.8173379 V     T = -25 °C: 359.3357301 V
Voltage for Gain 200: T = +20 °C: 400.1962252 V     T = -25 °C: 363.5435374 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.635859678 V-1     T = -25 °C: 4.827398749 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.748625009 V-1     T = -25 °C: 9.18326935 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.99328536 V-1     T = -25 °C: 15.42060932 V-1
Break-through voltage: T = +20 °C: 415.7251656 V     T = -25 °C: 379.072718 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:06 CEST jreher Updated box and position via API.
15. Apr 2021 16:43:10 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 10:50:04 CET jreher Updated box and position via API.
03. Feb 2021 18:16:14 CET jreher Updated box and position via API.
11. Aug 2020 17:22:36 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:35 CET jreher Updated APD location via API.
25. Nov 2019 17:12:17 CET jreher Updated box and position via API.
04. Jul 2019 11:08:37 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:44 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:24 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:07:12 CET markus.moritz
03. Jan 2019 00:11:40 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:46 CET Tobias Imported from Hamamatsu datasheet.