Show Hamamatsu Avalanche Photo Diode 2413026959 - Archived data from Tue, 11. August 2020 18:04:26 CEST
This is all the information about APD 2413026959. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2413026959 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Giessen, Box 28, Temp. in Box 287 |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | C14 |
Break-through voltage: | 417 V |
Voltage for Gain 100 (T=+25°C): | 388.8 V |
Dark current: | 6.7 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 287 |
Position in Box: | 40 |
EP1 batch: | 206 |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | none |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 389.3437254 V T = -25 °C: 353.8158237 V |
Voltage for Gain 150: | T = +20 °C: 397.2189782 V T = -25 °C: 361.2324596 V |
Voltage for Gain 200: | T = +20 °C: 401.5884977 V T = -25 °C: 365.4339095 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.455116244 V-1 T = -25 °C: 4.856429076 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.742244321 V-1 T = -25 °C: 10.17399029 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 15.22429689 V-1 T = -25 °C: 15.12034916 V-1 |
Break-through voltage: | T = +20 °C: 416.2415713 V T = -25 °C: 379.9175445 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:25:22 CET | jreher | Updated box and position via API. |
06. Oct 2020 18:55:05 CEST | jreher | |
11. Aug 2020 18:04:26 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:40:10 CEST | jreher | Updated box and position via API. |
17. Feb 2020 17:57:00 CET | spankonin | Updated APD batch assignment via API. |
29. Nov 2019 12:24:47 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:31:16 CET | jreher | Updated box and position via API. |
25. Nov 2019 17:13:07 CET | jreher | Updated box and position via API. |
22. Oct 2019 14:49:51 CEST | spankonin | |
15. Oct 2019 11:09:21 CEST | jgrochowski | Updated APD batch assignment via API. |
04. Jul 2019 11:10:03 CEST | jreher | Updated APD location via API. |
03. Jan 2019 00:11:40 CET | Tobias | Corrected dark current unit. |
12. Jan 2018 13:11:46 CET | Tobias | Imported from Hamamatsu datasheet. |