RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2413026958 - Archived data from Fri, 12. January 2018 13:11:46 CET


This is all the information about APD 2413026958. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2413026958
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G12
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 387.8 V
Dark current: 7.6E-9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 287
Position in Box: 39
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:08 CEST jreher Updated box and position via API.
15. Apr 2021 16:43:17 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:25:22 CET jreher Updated box and position via API.
06. Oct 2020 18:54:47 CEST jreher
11. Aug 2020 18:04:25 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:10 CEST jreher Updated box and position via API.
17. Feb 2020 17:57:00 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 12:24:47 CET jreher Updated APD location via API.
25. Nov 2019 17:31:16 CET jreher Updated box and position via API.
25. Nov 2019 17:13:07 CET jreher Updated box and position via API.
22. Oct 2019 14:47:53 CEST spankonin
15. Oct 2019 11:09:21 CEST jgrochowski Updated APD batch assignment via API.
04. Jul 2019 11:10:03 CEST jreher Updated APD location via API.
03. Jan 2019 00:11:40 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:46 CET Tobias Imported from Hamamatsu datasheet.