Show Hamamatsu Avalanche Photo Diode 2413026954 - Archived data from Tue, 06. October 2020 18:54:27 CEST
This is all the information about APD 2413026954. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2413026954 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | E12 |
Break-through voltage: | 415 V |
Voltage for Gain 100 (T=+25°C): | 386.7 V |
Dark current: | 8.5 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 287 |
Position in Box: | 38 |
EP1 batch: | 206 |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | none |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 386.9603728 V T = -25 °C: 351.4007511 V |
Voltage for Gain 150: | T = +20 °C: 394.8189195 V T = -25 °C: 358.8879576 V |
Voltage for Gain 200: | T = +20 °C: 399.1903879 V T = -25 °C: 362.9700597 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.570749805 V-1 T = -25 °C: 4.805758181 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 9.010356364 V-1 T = -25 °C: 9.519343751 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 13.92881 V-1 T = -25 °C: 14.53266426 V-1 |
Break-through voltage: | T = +20 °C: 414.4580244 V T = -25 °C: 377.8747853 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:25:22 CET | jreher | Updated box and position via API. |
06. Oct 2020 18:54:27 CEST | jreher | |
11. Aug 2020 18:04:25 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:40:10 CEST | jreher | Updated box and position via API. |
17. Feb 2020 17:57:00 CET | spankonin | Updated APD batch assignment via API. |
29. Nov 2019 12:24:47 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:31:16 CET | jreher | Updated box and position via API. |
25. Nov 2019 17:13:06 CET | jreher | Updated box and position via API. |
22. Oct 2019 14:49:07 CEST | spankonin | |
15. Oct 2019 11:09:21 CEST | jgrochowski | Updated APD batch assignment via API. |
04. Jul 2019 11:10:02 CEST | jreher | Updated APD location via API. |
03. Jan 2019 00:11:40 CET | Tobias | Corrected dark current unit. |
12. Jan 2018 13:11:46 CET | Tobias | Imported from Hamamatsu datasheet. |