RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2413026954 - Archived data from Tue, 06. October 2020 18:54:27 CEST


This is all the information about APD 2413026954. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2413026954
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.7 V
Dark current: 8.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 287
Position in Box: 38
EP1 batch: 206
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.9603728 V     T = -25 °C: 351.4007511 V
Voltage for Gain 150: T = +20 °C: 394.8189195 V     T = -25 °C: 358.8879576 V
Voltage for Gain 200: T = +20 °C: 399.1903879 V     T = -25 °C: 362.9700597 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.570749805 V-1     T = -25 °C: 4.805758181 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.010356364 V-1     T = -25 °C: 9.519343751 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.92881 V-1     T = -25 °C: 14.53266426 V-1
Break-through voltage: T = +20 °C: 414.4580244 V     T = -25 °C: 377.8747853 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:22 CET jreher Updated box and position via API.
06. Oct 2020 18:54:27 CEST jreher
11. Aug 2020 18:04:25 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:10 CEST jreher Updated box and position via API.
17. Feb 2020 17:57:00 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 12:24:47 CET jreher Updated APD location via API.
25. Nov 2019 17:31:16 CET jreher Updated box and position via API.
25. Nov 2019 17:13:06 CET jreher Updated box and position via API.
22. Oct 2019 14:49:07 CEST spankonin
15. Oct 2019 11:09:21 CEST jgrochowski Updated APD batch assignment via API.
04. Jul 2019 11:10:02 CEST jreher Updated APD location via API.
03. Jan 2019 00:11:40 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:46 CET Tobias Imported from Hamamatsu datasheet.