RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2413026952 - Archived data from Wed, 03. February 2021 18:17:35 CET


This is all the information about APD 2413026952. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2413026952
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2413026935/2413026952
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D10
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.8 V
Dark current: 7.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 28
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.8453066 V     T = -25 °C: 349.2118606 V
Voltage for Gain 150: T = +20 °C: 392.7387573 V     T = -25 °C: 356.6865582 V
Voltage for Gain 200: T = +20 °C: 397.1323522 V     T = -25 °C: 360.8815955 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.49423026 V-1     T = -25 °C: 4.64131185 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.633080113 V-1     T = -25 °C: 9.072733508 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.50537448 V-1     T = -25 °C: 15.56534834 V-1
Break-through voltage: T = +20 °C: 412.5132757 V     T = -25 °C: 376.1222849 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:29 CET jreher Updated box and position via API.
03. Feb 2021 18:17:35 CET jreher Updated box and position via API.
11. Aug 2020 17:24:18 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:49:37 CEST jreher Assigned to capsule by script
13. Feb 2020 15:11:37 CET jreher Updated box and position via API.
27. Nov 2019 19:34:28 CET jreher Updated APD location via API.
25. Nov 2019 17:13:06 CET jreher Updated box and position via API.
04. Jul 2019 11:10:02 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:31 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:26 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:40 CET Tobias Corrected dark current unit.
26. Nov 2018 12:27:37 CET markus.moritz
16. Nov 2018 15:02:06 CET markus.moritz
12. Jan 2018 13:11:46 CET Tobias Imported from Hamamatsu datasheet.