RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2413026944 - Archived data from Wed, 03. February 2021 18:17:34 CET


This is all the information about APD 2413026944. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2413026944
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2417027260/2413026944
Unit: #1009 (barcode 1309009510)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 381.7 V
Dark current: 8.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 28
Position in Box: 30
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.9752289 V     T = -25 °C: 346.4306125 V
Voltage for Gain 150: T = +20 °C: 389.8581541 V     T = -25 °C: 353.8671976 V
Voltage for Gain 200: T = +20 °C: 394.2508605 V     T = -25 °C: 358.0361713 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.472133922 V-1     T = -25 °C: 4.948982799 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.501624005 V-1     T = -25 °C: 8.931268212 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.17411671 V-1     T = -25 °C: 15.30548933 V-1
Break-through voltage: T = +20 °C: 409.8315484 V     T = -25 °C: 373.3013224 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:28 CET jreher Updated box and position via API.
03. Feb 2021 18:17:34 CET jreher Updated box and position via API.
11. Aug 2020 17:24:17 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:44:09 CEST jreher Assigned to capsule by script
13. Feb 2020 15:25:31 CET jreher Updated box and position via API.
27. Nov 2019 19:34:28 CET jreher Updated APD location via API.
25. Nov 2019 17:13:05 CET jreher Updated box and position via API.
04. Jul 2019 11:10:02 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:30 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:26 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:39 CET Tobias Corrected dark current unit.
26. Nov 2018 12:36:37 CET markus.moritz
16. Nov 2018 15:04:33 CET markus.moritz
12. Jan 2018 13:11:46 CET Tobias Imported from Hamamatsu datasheet.