RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2412026917 - Archived data from Fri, 05. February 2021 10:51:26 CET


This is all the information about APD 2412026917. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2412026917
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 28
Position in Box: 14
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.126672 V     T = -25 °C: 346.5643618 V
Voltage for Gain 150: T = +20 °C: 389.9802076 V     T = -25 °C: 353.8978474 V
Voltage for Gain 200: T = +20 °C: 394.3691078 V     T = -25 °C: 358.0982646 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.552473553 V-1     T = -25 °C: 5.361644712 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.495206831 V-1     T = -25 °C: 9.608280204 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.63843803 V-1     T = -25 °C: 14.80449007 V-1
Break-through voltage: T = +20 °C: 409.9361164 V     T = -25 °C: 373.2884609 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:21:35 CET jreher Assigned to capsule by script
05. Feb 2021 10:51:26 CET jreher Updated box and position via API.
03. Feb 2021 18:17:32 CET jreher Updated box and position via API.
18. Dec 2020 13:59:40 CET jreher Updated box and position via API.
11. Aug 2020 17:24:14 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:27 CET jreher Updated APD location via API.
25. Nov 2019 17:13:04 CET jreher Updated box and position via API.
04. Jul 2019 11:10:00 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:29 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:24 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:39 CET Tobias Corrected dark current unit.
26. Nov 2018 13:20:28 CET markus.moritz
16. Nov 2018 15:09:11 CET markus.moritz
12. Jan 2018 13:11:45 CET Tobias Imported from Hamamatsu datasheet.