RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2412026914 - Archived data from Tue, 11. August 2020 17:24:13 CEST


This is all the information about APD 2412026914. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2412026914
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.4 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 28
Position in Box: 11
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.5205513 V     T = -25 °C: 344.2762969 V
Voltage for Gain 150: T = +20 °C: 387.4247909 V     T = -25 °C: 351.6320657 V
Voltage for Gain 200: T = +20 °C: 391.7810286 V     T = -25 °C: 355.7912519 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.541330197 V-1     T = -25 °C: 5.130076442 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.595986856 V-1     T = -25 °C: 9.782637548 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.58600019 V-1     T = -25 °C: 15.24732127 V-1
Break-through voltage: T = +20 °C: 407.7923765 V     T = -25 °C: 371.2500123 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:25 CET jreher Updated box and position via API.
03. Feb 2021 18:17:32 CET jreher Updated box and position via API.
07. Oct 2020 12:19:08 CEST jreher Assigned to capsule by script
17. Aug 2020 15:54:06 CEST jreher Updated box and position via API.
11. Aug 2020 17:24:13 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:26 CET jreher Updated APD location via API.
25. Nov 2019 17:13:04 CET jreher Updated box and position via API.
04. Jul 2019 11:10:00 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:28 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:24 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:39 CET Tobias Corrected dark current unit.
26. Nov 2018 13:39:10 CET markus.moritz
16. Nov 2018 15:09:58 CET markus.moritz
12. Jan 2018 13:11:45 CET Tobias Imported from Hamamatsu datasheet.