RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2412026912 - Archived data from Tue, 11. August 2020 17:24:13 CEST


This is all the information about APD 2412026912. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2412026912
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D09
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.4 V
Dark current: 6.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 28
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.7658784 V     T = -25 °C: 347.1655409 V
Voltage for Gain 150: T = +20 °C: 390.6461544 V     T = -25 °C: 354.5906053 V
Voltage for Gain 200: T = +20 °C: 395.0409923 V     T = -25 °C: 358.7564241 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.641851205 V-1     T = -25 °C: 4.744959326 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.202062165 V-1     T = -25 °C: 9.411796596 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.50394426 V-1     T = -25 °C: 14.68886549 V-1
Break-through voltage: T = +20 °C: 410.6312628 V     T = -25 °C: 374.0599612 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 18:52:13 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:26:51 CET jreher Updated box and position via API.
05. Feb 2021 10:51:25 CET jreher Updated box and position via API.
03. Feb 2021 18:17:32 CET jreher Updated box and position via API.
11. Aug 2020 17:24:13 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:26 CET jreher Updated APD location via API.
25. Nov 2019 17:13:04 CET jreher Updated box and position via API.
04. Jul 2019 11:10:00 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:28 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:23 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:39 CET Tobias Corrected dark current unit.
26. Nov 2018 13:27:38 CET markus.moritz
16. Nov 2018 15:10:46 CET markus.moritz
12. Jan 2018 13:11:45 CET Tobias Imported from Hamamatsu datasheet.