Show Hamamatsu Avalanche Photo Diode 2412026892 - Archived data from Tue, 11. August 2020 17:22:34 CEST
This is all the information about APD 2412026892. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2412026892 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | C07 |
Break-through voltage: | 410 V |
Voltage for Gain 100 (T=+25°C): | 381.1 V |
Dark current: | 7.7 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 17 |
Position in Box: | 39 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 12. Nov 2018 |
Sent for analysis after irradiation: | 26. Nov 2018 |
Return for assembly: | none |
Irradiation: | |
Date: | 22. Nov 2018 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 23. Nov 2018 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 381.6402529 V T = -25 °C: 346.2623487 V |
Voltage for Gain 150: | T = +20 °C: 389.4739845 V T = -25 °C: 353.6652908 V |
Voltage for Gain 200: | T = +20 °C: 393.8543898 V T = -25 °C: 357.840458 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.621387822 V-1 T = -25 °C: 4.679860183 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.900979793 V-1 T = -25 °C: 9.182525974 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 15.05359393 V-1 T = -25 °C: 15.79543168 V-1 |
Break-through voltage: | T = +20 °C: 409.3062098 V T = -25 °C: 372.900932 V |
Notes: | foam |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 10:49:59 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:16:10 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:22:34 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 19:32:27 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:12:15 CET | jreher | Updated box and position via API. |
04. Jul 2019 11:08:32 CEST | jreher | Updated APD location via API. |
12. Jun 2019 16:46:42 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 16:31:37 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 15:09:16 CEST | jreher | Updated APD batch assignment via API. |
03. Jan 2019 00:11:38 CET | Tobias | Corrected dark current unit. |
26. Nov 2018 13:17:01 CET | markus.moritz | |
16. Nov 2018 12:05:58 CET | markus.moritz | |
12. Jan 2018 13:11:45 CET | Tobias | Imported from Hamamatsu datasheet. |