RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2412026887 - Archived data from Tue, 11. August 2020 17:22:33 CEST


This is all the information about APD 2412026887. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2412026887
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.7 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 17
Position in Box: 34
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.5424644 V     T = -25 °C: 348.9184108 V
Voltage for Gain 150: T = +20 °C: 392.4145647 V     T = -25 °C: 356.4397551 V
Voltage for Gain 200: T = +20 °C: 396.809191 V     T = -25 °C: 360.6794698 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.651715478 V-1     T = -25 °C: 4.756472266 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.024132429 V-1     T = -25 °C: 9.37054052 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.42565653 V-1     T = -25 °C: 14.36477376 V-1
Break-through voltage: T = +20 °C: 408.9993129 V     T = -25 °C: 375.2947123 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:49:59 CET jreher Updated box and position via API.
03. Feb 2021 18:16:09 CET jreher Updated box and position via API.
11. Aug 2020 17:22:33 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:26 CET jreher Updated APD location via API.
25. Nov 2019 17:12:14 CET jreher Updated box and position via API.
04. Jul 2019 11:08:31 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:42 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:37 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:16 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:38 CET Tobias Corrected dark current unit.
26. Nov 2018 13:19:55 CET markus.moritz
16. Nov 2018 12:08:50 CET markus.moritz
12. Jan 2018 13:11:45 CET Tobias Imported from Hamamatsu datasheet.