Subdetector specification:  
Serial: 2412026877
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2405026271/2412026877
Unit: #851 (barcode 1309009343)
Preamp: 4618
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.5 V
Dark current: 6.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 17
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.8764496 V     T = -25 °C: 347.2260117 V
Voltage for Gain 150: T = +20 °C: 390.6997041 V     T = -25 °C: 354.6308111 V
Voltage for Gain 200: T = +20 °C: 395.0574352 V     T = -25 °C: 358.7957517 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.548957971 V-1     T = -25 °C: 4.709724813 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.804872347 V-1     T = -25 °C: 9.266473168 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.95318537 V-1     T = -25 °C: 16.16460401 V-1
Break-through voltage: T = +20 °C: 410.2389506 V     T = -25 °C: 373.7050959 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:49:58 CET jreher Updated box and position via API.
03. Feb 2021 18:16:08 CET jreher Updated box and position via API.
11. Aug 2020 17:22:31 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:40 CET jreher Updated box and position via API.
27. Nov 2019 19:32:26 CET jreher Updated APD location via API.
25. Nov 2019 17:12:13 CET jreher Updated box and position via API.
15. Jul 2019 15:53:32 CEST jreher Assigned to unit by script
15. Jul 2019 15:38:17 CEST jreher Assigned to capsule by script
04. Jul 2019 11:08:31 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:41 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:36 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:15 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:38 CET Tobias Corrected dark current unit.
26. Nov 2018 13:09:26 CET markus.moritz
16. Nov 2018 12:12:47 CET markus.moritz
12. Jan 2018 13:11:45 CET Tobias Imported from Hamamatsu datasheet.