RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2412026868 - Archived data from Tue, 11. August 2020 17:22:29 CEST


This is all the information about APD 2412026868. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2412026868
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A07
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.2 V
Dark current: 9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 17
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.2002622 V     T = -25 °C: 351.1749861 V
Voltage for Gain 150: T = +20 °C: 395.0884017 V     T = -25 °C: 358.7169356 V
Voltage for Gain 200: T = +20 °C: 399.4611147 V     T = -25 °C: 362.9526662 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.419460804 V-1     T = -25 °C: 4.652335522 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.482413051 V-1     T = -25 °C: 9.098800239 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.28657309 V-1     T = -25 °C: 15.72464597 V-1
Break-through voltage: T = +20 °C: 413.7042112 V     T = -25 °C: 377.321377 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:49:57 CET jreher Updated box and position via API.
03. Feb 2021 18:16:07 CET jreher Updated box and position via API.
11. Aug 2020 17:22:29 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:25 CET jreher Updated APD location via API.
25. Nov 2019 17:12:13 CET jreher Updated box and position via API.
04. Jul 2019 11:08:30 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:40 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:36 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:14 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:37 CET Tobias Corrected dark current unit.
26. Nov 2018 13:04:53 CET markus.moritz
16. Nov 2018 12:16:17 CET markus.moritz
12. Jan 2018 13:11:45 CET Tobias Imported from Hamamatsu datasheet.