Show Hamamatsu Avalanche Photo Diode 2412026844 - Archived data from Tue, 11. August 2020 17:22:28 CEST
This is all the information about APD 2412026844. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2412026844 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | E01 |
Break-through voltage: | 412 V |
Voltage for Gain 100 (T=+25°C): | 382.8 V |
Dark current: | 5.8 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 17 |
Position in Box: | 10 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 12. Nov 2018 |
Sent for analysis after irradiation: | 26. Nov 2018 |
Return for assembly: | none |
Irradiation: | |
Date: | 22. Nov 2018 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 23. Nov 2018 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 383.0861453 V T = -25 °C: 347.5845802 V |
Voltage for Gain 150: | T = +20 °C: 391.0358884 V T = -25 °C: 355.1081497 V |
Voltage for Gain 200: | T = +20 °C: 395.4958361 V T = -25 °C: 359.3613673 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.379226575 V-1 T = -25 °C: 4.793113433 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 9.002929873 V-1 T = -25 °C: 9.411340152 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.98943457 V-1 T = -25 °C: 14.24760574 V-1 |
Break-through voltage: | T = +20 °C: 411.3549179 V T = -25 °C: 375.124729 V |
Notes: | foam |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 10:49:56 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:16:06 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:22:28 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 19:32:25 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:12:12 CET | jreher | Updated box and position via API. |
04. Jul 2019 11:08:30 CEST | jreher | Updated APD location via API. |
12. Jun 2019 16:46:39 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 16:31:35 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 15:09:09 CEST | jreher | Updated APD batch assignment via API. |
03. Jan 2019 00:11:37 CET | Tobias | Corrected dark current unit. |
26. Nov 2018 12:33:22 CET | markus.moritz | |
16. Nov 2018 12:18:10 CET | markus.moritz | |
12. Jan 2018 13:11:44 CET | Tobias | Imported from Hamamatsu datasheet. |