Show Hamamatsu Avalanche Photo Diode 2412026837 - Archived data from Mon, 25. November 2019 17:12:12 CET
This is all the information about APD 2412026837. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2412026837 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum Box 17 |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | B05 |
Break-through voltage: | 410 V |
Voltage for Gain 100 (T=+25°C): | 381.4 V |
Dark current: | 8.3 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 17 |
Position in Box: | 4 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 12. Nov 2018 |
Sent for analysis after irradiation: | 26. Nov 2018 |
Return for assembly: | none |
Irradiation: | |
Date: | 22. Nov 2018 |
Dose used: | 37 Gy |
Temperature: | 10 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 23. Nov 2018 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
Break-through voltage: | T = +20 °C: none T = -25 °C: none |
Notes: | foam |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 10:49:55 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:16:05 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:22:27 CEST | jreher | Updated APD characteristics via API. |
27. Mar 2020 11:32:41 CET | jreher | Assigned to capsule by script |
13. Feb 2020 15:25:41 CET | jreher | Updated box and position via API. |
27. Nov 2019 19:32:24 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:12:12 CET | jreher | Updated box and position via API. |
04. Jul 2019 11:08:29 CEST | jreher | Updated APD location via API. |
12. Jun 2019 16:46:39 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 16:31:34 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 15:09:08 CEST | jreher | Updated APD batch assignment via API. |
03. Jan 2019 00:11:37 CET | Tobias | Corrected dark current unit. |
26. Nov 2018 12:29:50 CET | markus.moritz | |
16. Nov 2018 12:19:42 CET | markus.moritz | |
12. Jan 2018 13:11:44 CET | Tobias | Imported from Hamamatsu datasheet. |