RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2412026834 - Archived data from Tue, 11. August 2020 17:22:26 CEST


This is all the information about APD 2412026834. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2412026834
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.1 V
Dark current: 6.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 17
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.4615708 V     T = -25 °C: 344.2484446 V
Voltage for Gain 150: T = +20 °C: 387.3260495 V     T = -25 °C: 351.6475191 V
Voltage for Gain 200: T = +20 °C: 391.7286236 V     T = -25 °C: 355.8168945 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.654993212 V-1     T = -25 °C: 4.691214525 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.960049141 V-1     T = -25 °C: 9.223952055 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.14048634 V-1     T = -25 °C: 15.79642189 V-1
Break-through voltage: T = +20 °C: 407.2533506 V     T = -25 °C: 371.2061532 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:49:55 CET jreher Updated box and position via API.
03. Feb 2021 18:16:05 CET jreher Updated box and position via API.
11. Aug 2020 17:22:26 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:24 CET jreher Updated APD location via API.
25. Nov 2019 17:12:12 CET jreher Updated box and position via API.
04. Jul 2019 11:08:29 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:34 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:08 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:37 CET Tobias Corrected dark current unit.
26. Nov 2018 12:27:44 CET markus.moritz
16. Nov 2018 12:20:38 CET markus.moritz
12. Jan 2018 13:11:44 CET Tobias Imported from Hamamatsu datasheet.