RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2412026830 - Archived data from Thu, 03. January 2019 00:11:36 CET


This is all the information about APD 2412026830. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2412026830
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 16
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
27. Jun 2022 12:42:01 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 10:29:19 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:49:52 CET jreher Updated box and position via API.
03. Feb 2021 18:16:02 CET jreher Updated box and position via API.
11. Aug 2020 17:22:26 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:16 CET jreher Updated APD location via API.
25. Nov 2019 17:12:11 CET jreher Updated box and position via API.
04. Jul 2019 11:08:24 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:38 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:34 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:08 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:36 CET Tobias Corrected dark current unit.
13. Dec 2018 13:40:12 CET markus.moritz
16. Nov 2018 15:39:03 CET markus.moritz
12. Jan 2018 13:11:44 CET Tobias Imported from Hamamatsu datasheet.