RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2412026826 - Archived data from Wed, 03. February 2021 18:16:02 CET


This is all the information about APD 2412026826. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2412026826
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2412026826/2411026745
Unit: #849 (barcode 1309009329)
Preamp: 4473
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.1 V
Dark current: 8.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 16
Position in Box: 43
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.7139217 V     T = -25 °C: 347.1936127 V
Voltage for Gain 150: T = +20 °C: 390.5689251 V     T = -25 °C: 354.6145214 V
Voltage for Gain 200: T = +20 °C: 394.9580336 V     T = -25 °C: 358.7945977 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.576971757 V-1     T = -25 °C: 4.684370703 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.805584921 V-1     T = -25 °C: 9.254717358 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.85316941 V-1     T = -25 °C: 15.96122082 V-1
Break-through voltage: T = +20 °C: 410.0120875 V     T = -25 °C: 373.7108057 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:52 CET jreher Updated box and position via API.
03. Feb 2021 18:16:02 CET jreher Updated box and position via API.
11. Aug 2020 17:22:25 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:39 CET jreher Updated box and position via API.
27. Nov 2019 19:32:16 CET jreher Updated APD location via API.
25. Nov 2019 17:12:10 CET jreher Updated box and position via API.
15. Jul 2019 15:51:58 CEST jreher Assigned to unit by script
15. Jul 2019 15:34:29 CEST jreher Assigned to capsule by script
04. Jul 2019 11:08:24 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:38 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:33 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:07 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:36 CET Tobias Corrected dark current unit.
13. Dec 2018 13:35:52 CET markus.moritz
16. Nov 2018 15:39:55 CET markus.moritz
12. Jan 2018 13:11:44 CET Tobias Imported from Hamamatsu datasheet.