RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2411026805 - Archived data from Wed, 03. February 2021 18:16:01 CET


This is all the information about APD 2411026805. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2411026805
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B05
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.9 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 16
Position in Box: 41
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.6209415 V     T = -25 °C: 350.7612744 V
Voltage for Gain 150: T = +20 °C: 394.4916909 V     T = -25 °C: 358.311093 V
Voltage for Gain 200: T = +20 °C: 398.8831515 V     T = -25 °C: 362.5613317 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.608615809 V-1     T = -25 °C: 4.80209538 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.957133534 V-1     T = -25 °C: 9.436748501 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.31314895 V-1     T = -25 °C: 14.49708484 V-1
Break-through voltage: T = +20 °C: 408.7950525 V     T = -25 °C: 377.9697449 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:51 CET jreher Updated box and position via API.
03. Feb 2021 18:16:01 CET jreher Updated box and position via API.
11. Aug 2020 17:22:25 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:16 CET jreher Updated APD location via API.
25. Nov 2019 17:12:10 CET jreher Updated box and position via API.
04. Jul 2019 11:08:24 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:38 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:33 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:07 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:36 CET Tobias Corrected dark current unit.
13. Dec 2018 13:32:54 CET markus.moritz
16. Nov 2018 15:40:37 CET markus.moritz
12. Jan 2018 13:11:44 CET Tobias Imported from Hamamatsu datasheet.