RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2411026793 - Archived data from Mon, 17. August 2020 15:53:20 CEST


This is all the information about APD 2411026793. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2411026793
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E14
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 380.8 V
Dark current: 5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 16
Position in Box: 29
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.0423521 V     T = -25 °C: 345.7634046 V
Voltage for Gain 150: T = +20 °C: 389.0115022 V     T = -25 °C: 353.1316702 V
Voltage for Gain 200: T = +20 °C: 393.3977049 V     T = -25 °C: 357.3815307 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.539255847 V-1     T = -25 °C: 5.108117561 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.907965524 V-1     T = -25 °C: 9.240540904 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.30224659 V-1     T = -25 °C: 17.06639143 V-1
Break-through voltage: T = +20 °C: 409.2677515 V     T = -25 °C: 372.875967 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:50 CET jreher Updated box and position via API.
03. Feb 2021 18:16:00 CET jreher Updated box and position via API.
07. Oct 2020 12:09:44 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:20 CEST jreher Updated box and position via API.
11. Aug 2020 17:22:22 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:15 CET jreher Updated APD location via API.
25. Nov 2019 17:12:09 CET jreher Updated box and position via API.
04. Jul 2019 11:08:23 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:37 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:32 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:01 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:36 CET Tobias Corrected dark current unit.
13. Dec 2018 13:26:34 CET markus.moritz
16. Nov 2018 15:45:14 CET markus.moritz
12. Jan 2018 13:11:44 CET Tobias Imported from Hamamatsu datasheet.