RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2411026770 - Archived data from Thu, 15. April 2021 16:57:54 CEST


This is all the information about APD 2411026770. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2411026770
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 3.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 16
Position in Box: 6
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.4516613 V     T = -25 °C: 345.9360587 V
Voltage for Gain 150: T = +20 °C: 389.2938769 V     T = -25 °C: 353.3628325 V
Voltage for Gain 200: T = +20 °C: 393.6204121 V     T = -25 °C: 357.5263512 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.435771218 V-1     T = -25 °C: 4.917818568 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.641866956 V-1     T = -25 °C: 8.772321033 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.87762353 V-1     T = -25 °C: 15.73048956 V-1
Break-through voltage: T = +20 °C: 409.1494818 V     T = -25 °C: 372.6318357 V
   
Notes:


Version history

Time Author Change comment
27. Oct 2021 14:25:03 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 16:57:54 CEST jreher Updated box and position via API.
05. Feb 2021 10:49:47 CET jreher Updated box and position via API.
03. Feb 2021 18:15:57 CET jreher Updated box and position via API.
11. Aug 2020 17:22:18 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:13 CET jreher Updated APD location via API.
25. Nov 2019 17:12:07 CET jreher Updated box and position via API.
04. Jul 2019 11:08:21 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:35 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:30 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:00 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:35 CET Tobias Corrected dark current unit.
13. Dec 2018 12:30:58 CET markus.moritz
12. Jan 2018 13:11:43 CET Tobias Imported from Hamamatsu datasheet.