RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2411026760 - Archived data from Tue, 11. August 2020 17:22:16 CEST


This is all the information about APD 2411026760. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2411026760
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 390.6 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 15
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.4172014 V     T = -25 °C: 355.1843409 V
Voltage for Gain 150: T = +20 °C: 399.2877947 V     T = -25 °C: 362.8005738 V
Voltage for Gain 200: T = +20 °C: 403.6646441 V     T = -25 °C: 367.0706573 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.619782094 V-1     T = -25 °C: 4.535248264 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.92930866 V-1     T = -25 °C: 8.729587096 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.06173125 V-1     T = -25 °C: 14.58050357 V-1
Break-through voltage: T = +20 °C: 417.3710521 V     T = -25 °C: 381.0180913 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:44 CET jreher Updated box and position via API.
03. Feb 2021 18:15:54 CET jreher Updated box and position via API.
11. Aug 2020 17:22:16 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:06 CET jreher Updated APD location via API.
25. Nov 2019 17:12:06 CET jreher Updated box and position via API.
25. Jul 2019 10:30:30 CEST jreher
04. Jul 2019 11:08:16 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:34 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:29 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:52 CEST jreher Updated APD batch assignment via API.
15. Feb 2019 14:13:34 CET jreher Updated APD batch assignment via API.
15. Feb 2019 14:13:22 CET jreher Updated APD batch assignment via API.
15. Feb 2019 14:12:25 CET jreher Updated APD batch assignment via API.
15. Feb 2019 14:12:02 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:58:09 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:57:43 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:54:39 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:52:19 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:51:49 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:51:21 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:48:40 CET jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:34 CET Tobias Corrected dark current unit.
13. Dec 2018 10:57:10 CET markus.moritz
23. Nov 2018 14:10:03 CET markus.moritz
12. Jan 2018 13:11:43 CET Tobias Imported from Hamamatsu datasheet.