RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2411026753 - Archived data from Tue, 16. February 2021 12:25:56 CET


This is all the information about APD 2411026753. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2411026753
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.9 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 15
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.3264132 V     T = -25 °C: 347.6961877 V
Voltage for Gain 150: T = +20 °C: 391.1936275 V     T = -25 °C: 355.151878 V
Voltage for Gain 200: T = +20 °C: 395.5899211 V     T = -25 °C: 359.3415594 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.681046989 V-1     T = -25 °C: 4.825008196 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.086509498 V-1     T = -25 °C: 9.56889337 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.38088793 V-1     T = -25 °C: 14.70899519 V-1
Break-through voltage: T = +20 °C: 411.1078383 V     T = -25 °C: 374.3318989 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:13:59 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:25:56 CET jreher Updated box and position via API.
05. Feb 2021 10:49:43 CET jreher Updated box and position via API.
03. Feb 2021 18:15:53 CET jreher Updated box and position via API.
11. Aug 2020 17:22:15 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:05 CET jreher Updated APD location via API.
25. Nov 2019 17:12:05 CET jreher Updated box and position via API.
25. Jul 2019 10:29:11 CEST jreher
04. Jul 2019 11:08:16 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:33 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:28 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:52 CEST jreher Updated APD batch assignment via API.
15. Feb 2019 14:13:33 CET jreher Updated APD batch assignment via API.
15. Feb 2019 14:13:21 CET jreher Updated APD batch assignment via API.
15. Feb 2019 14:12:25 CET jreher Updated APD batch assignment via API.
15. Feb 2019 14:12:02 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:58:09 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:57:43 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:54:38 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:52:18 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:51:48 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:51:21 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:48:40 CET jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:34 CET Tobias Corrected dark current unit.
13. Dec 2018 11:16:52 CET markus.moritz
23. Nov 2018 14:12:16 CET markus.moritz
12. Jan 2018 13:11:43 CET Tobias Imported from Hamamatsu datasheet.