Show Hamamatsu Avalanche Photo Diode 2411026746 - Archived data from Mon, 17. August 2020 15:50:59 CEST


This is all the information about APD 2411026746. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2411026746
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D11
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.7 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 15
Position in Box: 33
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.0052941 V     T = -25 °C: 346.3348655 V
Voltage for Gain 150: T = +20 °C: 389.8869999 V     T = -25 °C: 353.7808633 V
Voltage for Gain 200: T = +20 °C: 394.2690658 V     T = -25 °C: 357.9620921 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.471494674 V-1     T = -25 °C: 4.642091258 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.528117673 V-1     T = -25 °C: 9.111374358 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.37102373 V-1     T = -25 °C: 15.63962513 V-1
Break-through voltage: T = +20 °C: 409.4733778 V     T = -25 °C: 372.6831155 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:42 CET jreher Updated box and position via API.
03. Feb 2021 18:15:52 CET jreher Updated box and position via API.
25. Jan 2021 14:45:01 CET jreher Assigned to capsule by script
17. Aug 2020 15:50:59 CEST jreher Updated box and position via API.
11. Aug 2020 17:22:14 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:05 CET jreher Updated APD location via API.
25. Nov 2019 17:12:05 CET jreher Updated box and position via API.
25. Jul 2019 10:27:50 CEST jreher
04. Jul 2019 11:08:15 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:33 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:28 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:51 CEST jreher Updated APD batch assignment via API.
15. Feb 2019 14:13:33 CET jreher Updated APD batch assignment via API.
15. Feb 2019 14:13:21 CET jreher Updated APD batch assignment via API.
15. Feb 2019 14:12:24 CET jreher Updated APD batch assignment via API.
15. Feb 2019 14:12:01 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:58:08 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:57:42 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:54:38 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:52:18 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:51:48 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:51:20 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:48:39 CET jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:34 CET Tobias Corrected dark current unit.
13. Dec 2018 11:08:52 CET markus.moritz
23. Nov 2018 14:13:46 CET markus.moritz
12. Jan 2018 13:11:43 CET Tobias Imported from Hamamatsu datasheet.