RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2410026725 - Archived data from Fri, 15. February 2019 14:12:01 CET


This is all the information about APD 2410026725. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2410026725
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D12
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.4 V
Dark current: 7.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 15
Position in Box: 29
EP1 batch: 40
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:41:42 CET oafedulidis Assigned to capsule by script
27. Aug 2021 10:31:10 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:49:42 CET jreher Updated box and position via API.
03. Feb 2021 18:15:52 CET jreher Updated box and position via API.
11. Aug 2020 17:22:13 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:04 CET jreher Updated APD location via API.
25. Nov 2019 17:12:04 CET jreher Updated box and position via API.
25. Jul 2019 10:26:42 CEST jreher
04. Jul 2019 11:08:15 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:32 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:27 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:51 CEST jreher Updated APD batch assignment via API.
15. Feb 2019 14:13:32 CET jreher Updated APD batch assignment via API.
15. Feb 2019 14:13:20 CET jreher Updated APD batch assignment via API.
15. Feb 2019 14:12:24 CET jreher Updated APD batch assignment via API.
15. Feb 2019 14:12:01 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:58:08 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:57:42 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:54:38 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:52:17 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:51:47 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:51:20 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:48:39 CET jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:34 CET Tobias Corrected dark current unit.
13. Dec 2018 11:32:01 CET markus.moritz
23. Nov 2018 14:15:34 CET markus.moritz
12. Jan 2018 13:11:43 CET Tobias Imported from Hamamatsu datasheet.