RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0722007016 - Archived data from Fri, 18. December 2020 13:59:54 CET


This is all the information about APD 0722007016. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0722007016
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E05
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.1 V
Dark current: 11.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 196
Position in Box: 10
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.3314893 V     T = -25 °C: 344.4560192 V
Voltage for Gain 150: T = +20 °C: 387.1806787 V     T = -25 °C: 351.7616247 V
Voltage for Gain 200: T = +20 °C: 391.5537933 V     T = -25 °C: 355.8605473 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.496435894 V-1     T = -25 °C: 4.811471452 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.780561228 V-1     T = -25 °C: 9.786182357 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.28013556 V-1     T = -25 °C: 15.595517 V-1
Break-through voltage: T = +20 °C: 406.8694307 V     T = -25 °C: 370.6664317 V
   
Notes:


Version history

Time Author Change comment
15. Feb 2021 15:38:10 CET jreher Assigned to capsule by script
05. Feb 2021 11:13:38 CET jreher Updated box and position via API.
18. Dec 2020 13:59:54 CET jreher Updated box and position via API.
11. Aug 2020 17:35:48 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:03:45 CET jreher Updated APD location via API.
25. Nov 2019 17:26:18 CET jreher Updated box and position via API.
16. Aug 2019 12:21:18 CEST jreher Updated APD location via API.
09. Aug 2019 17:02:32 CEST spankonin Updated APD batch assignment via API.
07. Aug 2019 13:32:22 CEST markus.moritz
22. Jun 2016 15:13:24 CEST Tobias Imported from Hamamatsu datasheet.