RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2410026696 - Archived data from Wed, 07. October 2020 12:28:09 CEST


This is all the information about APD 2410026696. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2410026696
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2316025542/2410026696
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G06
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 378.8 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 15
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.0287495 V     T = -25 °C: 343.6286057 V
Voltage for Gain 150: T = +20 °C: 386.7299652 V     T = -25 °C: 350.9331133 V
Voltage for Gain 200: T = +20 °C: 391.0290866 V     T = -25 °C: 355.0489703 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.701335023 V-1     T = -25 °C: 4.670156277 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.264411365 V-1     T = -25 °C: 9.6570603 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.13338402 V-1     T = -25 °C: 15.78080432 V-1
Break-through voltage: T = +20 °C: 406.5923525 V     T = -25 °C: 370.5678825 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:49:39 CET jreher Updated box and position via API.
03. Feb 2021 18:15:48 CET jreher Updated box and position via API.
07. Oct 2020 12:28:09 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:38 CEST jreher Updated box and position via API.
11. Aug 2020 17:22:08 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:02 CET jreher Updated APD location via API.
25. Nov 2019 17:12:02 CET jreher Updated box and position via API.
04. Jul 2019 11:08:13 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:30 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:25 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:43 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:32 CET Tobias Corrected dark current unit.
26. Nov 2018 12:25:36 CET markus.moritz
16. Nov 2018 12:22:29 CET markus.moritz
12. Jan 2018 13:11:42 CET Tobias Imported from Hamamatsu datasheet.