RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0722007012 - Archived data from Fri, 18. December 2020 13:59:24 CET


This is all the information about APD 0722007012. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0722007012
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 379.9 V
Dark current: 9.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 196
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1023147 V     T = -25 °C: 344.9958922 V
Voltage for Gain 150: T = +20 °C: 387.929023 V     T = -25 °C: 352.2998525 V
Voltage for Gain 200: T = +20 °C: 392.2881313 V     T = -25 °C: 356.4054619 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.584903123 V-1     T = -25 °C: 4.983675264 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.064247328 V-1     T = -25 °C: 9.274662077 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.07674544 V-1     T = -25 °C: 14.63842479 V-1
Break-through voltage: T = +20 °C: 408.1035284 V     T = -25 °C: 371.6600848 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:21:04 CET jreher Assigned to capsule by script
05. Feb 2021 11:13:38 CET jreher Updated box and position via API.
18. Dec 2020 13:59:24 CET jreher Updated box and position via API.
11. Aug 2020 17:35:48 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:03:45 CET jreher Updated APD location via API.
25. Nov 2019 17:26:18 CET jreher Updated box and position via API.
16. Aug 2019 12:21:18 CEST jreher Updated APD location via API.
09. Aug 2019 17:02:32 CEST spankonin Updated APD batch assignment via API.
07. Aug 2019 13:31:08 CEST markus.moritz
22. Jun 2016 15:13:24 CEST Tobias Imported from Hamamatsu datasheet.