RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2319025777 - Archived data from Fri, 05. February 2021 11:16:44 CET


This is all the information about APD 2319025777. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2319025777
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 388.2 V
Dark current: 3.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 58
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.4750917 V     T = -25 °C: 351.4446835 V
Voltage for Gain 150: T = +20 °C: 395.3056895 V     T = -25 °C: 358.9518926 V
Voltage for Gain 200: T = +20 °C: 399.6370536 V     T = -25 °C: 363.1411305 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.450165725 V-1     T = -25 °C: 4.67900474 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.762155326 V-1     T = -25 °C: 9.405253029 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.37191237 V-1     T = -25 °C: 14.85620727 V-1
Break-through voltage: T = +20 °C: 413.9664784 V     T = -25 °C: 378.1264479 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:30:15 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:16:44 CET jreher Updated box and position via API.
11. Aug 2020 17:42:37 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:27:40 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:07 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:18 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:28 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:35 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:34 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:07:57 CET jreher Updated APD location via API.
25. Nov 2019 17:28:04 CET jreher Updated box and position via API.
22. Oct 2019 16:34:03 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:12:05 CEST spankonin Updated APD location via API.
23. Jun 2016 12:00:17 CEST Tobias Imported from Hamamatsu datasheet.