Subdetector specification:  
Serial: 2319025770
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2317025606/2319025770
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E11
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 220
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7031596 V     T = -25 °C: 345.3365664 V
Voltage for Gain 150: T = +20 °C: 388.5376266 V     T = -25 °C: 352.6778396 V
Voltage for Gain 200: T = +20 °C: 392.8547318 V     T = -25 °C: 356.7876724 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.747587013 V-1     T = -25 °C: 4.826718479 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.408856828 V-1     T = -25 °C: 9.903683085 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.80688889 V-1     T = -25 °C: 15.80512274 V-1
Break-through voltage: T = +20 °C: 408.7543535 V     T = -25 °C: 372.3711094 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:16:44 CET jreher Updated box and position via API.
11. Aug 2020 17:42:36 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:27:40 CEST jreher Updated box and position via API.
31. Mar 2020 08:52:59 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:01 CET jreher Updated box and position via API.
16. Jan 2020 12:06:07 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:17 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:27 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:35 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:34 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:07:57 CET jreher Updated APD location via API.
25. Nov 2019 17:28:03 CET jreher Updated box and position via API.
22. Oct 2019 16:34:02 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:12:04 CEST spankonin Updated APD location via API.
23. Jun 2016 12:00:16 CEST Tobias Imported from Hamamatsu datasheet.