RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2319025761 - Archived data from Fri, 05. February 2021 11:16:42 CET


This is all the information about APD 2319025761. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2319025761
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.7 V
Dark current: 5.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 58
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.1127799 V     T = -25 °C: 349.3600683 V
Voltage for Gain 150: T = +20 °C: 392.9340799 V     T = -25 °C: 356.8612714 V
Voltage for Gain 200: T = +20 °C: 397.2938545 V     T = -25 °C: 361.0678391 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.550951567 V-1     T = -25 °C: 4.695079641 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.988422525 V-1     T = -25 °C: 9.377995059 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.92651268 V-1     T = -25 °C: 14.69817025 V-1
Break-through voltage: T = +20 °C: 411.9458023 V     T = -25 °C: 376.3758144 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:30:15 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:16:42 CET jreher Updated box and position via API.
11. Aug 2020 17:42:34 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:27:39 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:06 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:16 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:27 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:34 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:33 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:07:56 CET jreher Updated APD location via API.
25. Nov 2019 17:28:03 CET jreher Updated box and position via API.
22. Oct 2019 16:33:31 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:26:24 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:12:03 CEST spankonin Updated APD location via API.
23. Jun 2016 12:00:16 CEST Tobias Imported from Hamamatsu datasheet.