RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0721006999 - Archived data from Fri, 05. February 2021 10:55:42 CET


This is all the information about APD 0721006999. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0721006999
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E14
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 385.1 V
Dark current: 12.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 52
Position in Box: 44
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 04. Jun 2019
Return for assembly: none
   
Irradiation:  
Date: 29. May 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 29. May 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.4266987 V     T = -25 °C: 348.8865375 V
Voltage for Gain 150: T = +20 °C: 392.2781755 V     T = -25 °C: 356.2323701 V
Voltage for Gain 200: T = +20 °C: 396.6216459 V     T = -25 °C: 360.3859844 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.236347665 V-1     T = -25 °C: 4.905367677 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.121780498 V-1     T = -25 °C: 9.494396767 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.02931928 V-1     T = -25 °C: 16.32483761 V-1
Break-through voltage: T = +20 °C: 409.4462311 V     T = -25 °C: 373.5624608 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:48:27 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:55:42 CET jreher Updated box and position via API.
03. Feb 2021 18:21:16 CET jreher Updated box and position via API.
11. Aug 2020 17:28:18 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:38:48 CET jreher Updated APD location via API.
25. Nov 2019 17:15:24 CET jreher Updated box and position via API.
04. Jul 2019 11:12:58 CEST jreher Updated APD location via API.
03. Jul 2019 18:43:27 CEST jreher Updated APD batch assignment via API.
24. Jun 2019 13:02:35 CEST jgrochowski Updated APD batch assignment via API.
18. Jun 2019 14:19:31 CEST jgrochowski Updated APD batch assignment via API.
04. Jun 2019 14:48:11 CEST markus.moritz
22. Jun 2016 15:13:23 CEST Tobias Imported from Hamamatsu datasheet.