RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2318025722 - Archived data from Tue, 11. August 2020 17:41:23 CEST


This is all the information about APD 2318025722. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2318025722
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A06
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.7 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 234
Position in Box: 14
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.6482709 V     T = -25 °C: 351.6176047 V
Voltage for Gain 150: T = +20 °C: 395.5671429 V     T = -25 °C: 359.1757681 V
Voltage for Gain 200: T = +20 °C: 399.9435108 V     T = -25 °C: 363.4156244 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.355707825 V-1     T = -25 °C: 4.616765882 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.32676309 V-1     T = -25 °C: 9.142979748 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.52557708 V-1     T = -25 °C: 14.2012988 V-1
Break-through voltage: T = +20 °C: 415.3325729 V     T = -25 °C: 379.1714813 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:09 CEST jreher Updated box and position via API.
15. Apr 2021 16:43:18 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:18:26 CET jreher Updated box and position via API.
11. Aug 2020 17:41:23 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:29:58 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:04 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:14 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:24 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:32 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:31 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:10:27 CET jreher Updated APD location via API.
25. Nov 2019 17:29:03 CET jreher Updated box and position via API.
22. Oct 2019 12:56:09 CEST spankonin Updated APD location via API.
18. Oct 2019 14:04:37 CEST jgrochowski Updated APD batch assignment via API.
23. Jun 2016 12:00:15 CEST Tobias Imported from Hamamatsu datasheet.