RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2317025612 - Archived data from Tue, 11. August 2020 17:42:13 CEST


This is all the information about APD 2317025612. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2317025612
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 390.5 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 221
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.1161616 V     T = -25 °C: 354.7593805 V
Voltage for Gain 150: T = +20 °C: 398.9469685 V     T = -25 °C: 362.3077231 V
Voltage for Gain 200: T = +20 °C: 403.2895506 V     T = -25 °C: 366.5347714 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.556636874 V-1     T = -25 °C: 4.893614163 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.059807437 V-1     T = -25 °C: 9.001923352 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.1522773 V-1     T = -25 °C: 15.96833219 V-1
Break-through voltage: T = +20 °C: 417.5005709 V     T = -25 °C: 381.392685 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 11:13:38 CET oafedulidis Assigned to capsule by script
30. Aug 2021 14:07:25 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:16:49 CET jreher Updated box and position via API.
11. Aug 2020 17:42:13 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:27:49 CEST jreher Updated box and position via API.
16. Jan 2020 12:05:57 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:08 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:18 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:24 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:24 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:08:07 CET jreher Updated APD location via API.
25. Nov 2019 17:28:07 CET jreher Updated box and position via API.
22. Oct 2019 16:24:59 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:09:27 CEST spankonin Updated APD location via API.
23. Jun 2016 12:00:12 CEST Tobias Imported from Hamamatsu datasheet.