Show Hamamatsu Avalanche Photo Diode 2317025590 - Archived data from Mon, 28. October 2019 11:13:09 CET
This is all the information about APD 2317025590. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2317025590 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum Box 216 |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | H07 |
Break-through voltage: | 411 V |
Voltage for Gain 100 (T=+25°C): | 383.2 V |
Dark current: | 6.2 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 216 |
Position in Box: | 45 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | none |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
Break-through voltage: | T = +20 °C: none T = -25 °C: none |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:16:12 CET | jreher | Updated box and position via API. |
08. Dec 2020 17:17:54 CET | jreher | Assigned to capsule by script |
06. Oct 2020 16:53:08 CEST | jreher | Updated box and position via API. |
11. Aug 2020 17:42:09 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:26:59 CEST | jreher | Updated box and position via API. |
16. Jan 2020 12:05:56 CET | jreher | Updated date sent for analysis after screening via API. |
16. Jan 2020 12:04:06 CET | jreher | Updated annealing info via API. |
16. Jan 2020 12:01:16 CET | jreher | Updated irradiation info via API. |
16. Jan 2020 11:58:21 CET | jreher | Updated arrival for irradiation via API. |
16. Jan 2020 11:57:22 CET | jreher | Updated arrival for irradiation via API. |
27. Nov 2019 20:07:13 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:27:46 CET | jreher | Updated box and position via API. |
28. Oct 2019 11:13:09 CET | jreher | Updated APD location via API. |
22. Oct 2019 16:24:34 CEST | spankonin | Updated APD batch assignment via API. |
23. Jun 2016 12:00:11 CEST | Tobias | Imported from Hamamatsu datasheet. |