RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2317025571 - Archived data from Tue, 11. August 2020 17:41:52 CEST


This is all the information about APD 2317025571. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2317025571
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B10
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.8 V
Dark current: 6.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 233
Position in Box: 19
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.328893 V     T = -25 °C: 351.1905818 V
Voltage for Gain 150: T = +20 °C: 395.2143346 V     T = -25 °C: 358.7234051 V
Voltage for Gain 200: T = +20 °C: 399.5891516 V     T = -25 °C: 362.943865 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.457226433 V-1     T = -25 °C: 4.730784732 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.657951736 V-1     T = -25 °C: 9.482964713 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.13884602 V-1     T = -25 °C: 14.9332346 V-1
Break-through voltage: T = +20 °C: 414.4854248 V     T = -25 °C: 378.0190014 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 17:00:56 CEST jreher Updated box and position via API.
05. Feb 2021 11:18:19 CET jreher Updated box and position via API.
11. Aug 2020 17:41:52 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:29:48 CEST jreher Updated box and position via API.
16. Jan 2020 12:05:54 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:04 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:15 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:18 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:21 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:10:17 CET jreher Updated APD location via API.
25. Nov 2019 17:28:59 CET jreher Updated box and position via API.
22. Oct 2019 13:08:17 CEST spankonin Updated APD location via API.
18. Oct 2019 14:12:39 CEST jgrochowski Updated APD batch assignment via API.
23. Jun 2016 12:00:11 CEST Tobias Imported from Hamamatsu datasheet.