RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2317025568 - Archived data from Tue, 06. October 2020 16:52:45 CEST


This is all the information about APD 2317025568. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2317025568
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.7 V
Dark current: 6.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 233
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.6654487 V     T = -25 °C: 348.8867226 V
Voltage for Gain 150: T = +20 °C: 392.5794946 V     T = -25 °C: 356.3675711 V
Voltage for Gain 200: T = +20 °C: 396.9726277 V     T = -25 °C: 360.5562096 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.355226571 V-1     T = -25 °C: 4.886461654 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.241994364 V-1     T = -25 °C: 9.000775084 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.40843509 V-1     T = -25 °C: 15.88926268 V-1
Break-through voltage: T = +20 °C: 412.6216655 V     T = -25 °C: 376.0284906 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:18:19 CET jreher Updated box and position via API.
29. Jan 2021 10:23:31 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:45 CEST jreher Updated box and position via API.
11. Aug 2020 17:41:52 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:29:47 CEST jreher Updated box and position via API.
16. Jan 2020 12:05:54 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:04 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:14 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:18 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:20 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:10:16 CET jreher Updated APD location via API.
25. Nov 2019 17:28:58 CET jreher Updated box and position via API.
22. Oct 2019 13:08:16 CEST spankonin Updated APD location via API.
18. Oct 2019 14:12:38 CEST jgrochowski Updated APD batch assignment via API.
23. Jun 2016 12:00:11 CEST Tobias Imported from Hamamatsu datasheet.